All CPDs
RIBA-aligned CPD
Acoustic floor systems for residential schemes
Designing compliant acoustic floor build-ups for apartments, student accommodation and Build-to-Rent — including pre-completion testing strategies.
45 min Intermediate In-person or online

About this CPD
Approved Document E sets the minimum, but specifications increasingly target performance well beyond it. This CPD covers how flowing screeds combine with resilient layers and isolation systems to deliver high-performance acoustic floors in multi-residential construction.
We review tested build-ups, common detailing pitfalls at perimeters and service penetrations, and how to de-risk pre-completion sound testing.
Learning outcomes
- Specify floor build-ups that meet or exceed Approved Document E.
- Understand the role of resilient layers and isolation strips.
- Detail correctly at perimeters, thresholds and service penetrations.
- Reduce the risk of pre-completion test failures.
Who it's for
- · Architects
- · Acoustic consultants
- · Developers
- · Main contractors
Format
- · 45 minutes
- · RIBA-aligned
- · In-person or online
- · Tested build-ups included
